Tax Points for Consulting Services: Retainers vs Progress BAST Milestones
Architectural and engineering contracts are billed in stages: mobilization advance, schematic design, detailed engineering design (DED), and periodic site supervision. Under VAT Law Article 13(1a) and PER-11/PJ/2025 Article 31(2), Tax Invoices must be issued upon advance payment or when progress acceptance certificates (BAST) are approved, whichever comes first. Coretax e-Faktur approval must conclude before the 20th of the following month to avoid the 1% tax base penalty (HPP Law / KUP Article 14(4)). Neracia aligns BAST dates with prompt e-Faktur drafts.